

Trousers, chinos & shorts
Chinos, cargo, work trousers, formal trousers and shorts.
Woven bottoms in cotton twill, stretch twill, ripstop and canvas, garment-dyed or piece-dyed.
- Product price
- $4.50–13.00 / pc
- Lead time
- 53–96 days
- Minimum order
- 500 pcs per style per colour
- HS code
- 6203.42 · 6203.43 · 6204.62
Import duty: 0% in the EU, UK, Canada, Australia and China. All markets
Buying for:United KingdomGermanyNetherlandsFranceSpainItalyPolandBelgiumUnited StatesCanadaAustraliaJapanSingaporeSaudi Arabia
5 types of trousers, chinos & shorts
Open any product for its full details, quantity calculator and order total.
Price calculator
Pick a type, your options and quantity. The unit price and order total update as you go.
Estimate only, from November 2026 market data and our costings. Your proforma invoice confirms the price.
Specs and options
Fabrics
| Fabric | Weight | Notes |
|---|---|---|
| Cotton twill | 7–9 oz | Classic chino |
| Stretch twill (2% elastane) | 7–9 oz | Comfort fit |
| Ripstop | 6–8 oz | Tear-resistant, cargo |
| Canvas / duck | 10–12 oz | Workwear |
| Poly-viscose suiting | 220–280 GSM | Formal trousers |
Sizes: Waist 28–44 in
Packing and shipping
| Item | Detail |
|---|---|
| Packing | Folded, polybag, 24–40 pcs per carton |
| 40 ft HC container | about 16,000–20,000 pcs |
Container loads are approximate and depend on size ratio, folding and carton size.
Ships from: Chattogram port by sea container; Dhaka by air for urgent orders.
Price basis: product prices shown; your offer is CIF to your port (sea) or CIP (air), with freight and insurance included.
Transit: 7–12 days to Malaysia and Singapore, 32–42 days to Europe and the UK, 28–45 days to the USA by sea; 1–4 days by air.
All routes and transit timesLead time: 53–96 days
From order confirmation and sample approval to shipment. Stock fabrics and repeat orders are faster.
- Sampling and approval10–15 days
- Lab dip / strike-off5–10 days
- Fabric sourcing or weaving15–30 days
- Cutting3–6 days
- Sewing15–25 days
- Washing (if any), finishing, inspection, packing5–10 days
Some stages run in parallel, so the total is often shorter than the sum.
Quality, tests and certificates
Tests and inspections
- Dimensional stability (shrinkage) AATCC 135 / ISO 6330
- Colour fastness to washing ISO 105-C06 and rubbing ISO 105-X12
- Spirality / torque after wash
- Pilling ISO 12945
- Fabric weight (GSM) and composition
- Seam strength
- AQL 2.5 final inspection (third-party on request: SGS, Intertek, Bureau Veritas)
Certificates available
Ask for the certificate copies of the factory or farm that makes your order.
Ready to price your trousers, chinos & shorts order?
Add types to your quote, then send one request for everything.












