

Activewear & sportswear
Leggings, sports bras, training tees, tracksuits and sublimated team kits.
Activewear uses polyester or nylon with elastane for stretch, wicking and quick drying. Team kits are fully sublimated with names and numbers.
- Product price
- $1.90–15.00 / pc
- Lead time
- 39–71 days
- Minimum order
- 500 pcs per style (team kits from 100 sets)
- HS code
- 6114.30 · 6104.63 · 6112.12
Import duty: 0% in the EU, UK, Canada, Australia and China. All markets
Buying for:United KingdomGermanyNetherlandsFranceSpainItalyPolandBelgiumUnited StatesCanadaAustraliaJapanSingaporeSaudi Arabia
6 types of activewear & sportswear
Open any product for its full details, quantity calculator and order total.





Sublimated team jersey
Football, cricket, basketball kits with names and numbers.

Price calculator
Pick a type, your options and quantity. The unit price and order total update as you go.
Estimate only, from November 2026 market data and our costings. Your proforma invoice confirms the price.
Specs and options
Performance fabrics
| Fabric | Composition | Notes |
|---|---|---|
| Poly-spandex jersey | 88/12 | Leggings, bras |
| Nylon-spandex | 78/22 | Premium soft, high stretch |
| Polyester bird-eye mesh | 100% poly | Jerseys, breathable |
| Recycled polyester | rPET | GRS certified |
| Tricot | 100% poly | Tracksuits |
Sizes: XS–3XL
Packing and shipping
| Item | Detail |
|---|---|
| Packing | 1 pc polybag, 50–100 pcs per carton |
| 40 ft HC container | about 40,000–60,000 pcs (leggings) |
Container loads are approximate and depend on size ratio, folding and carton size.
Ships from: Chattogram port by sea container; Dhaka by air for urgent orders.
Price basis: product prices shown; your offer is CIF to your port (sea) or CIP (air), with freight and insurance included.
Transit: 7–12 days to Malaysia and Singapore, 32–42 days to Europe and the UK, 28–45 days to the USA by sea; 1–4 days by air.
All routes and transit timesLead time: 39–71 days
From order confirmation and sample approval to shipment. Stock fabrics and repeat orders are faster.
- Sampling and approval7–12 days
- Lab dip / colour approval5–7 days
- Yarn, knitting, dyeing, finishing10–18 days
- Cutting and printing3–7 days
- Sewing10–20 days
- Finishing, inspection, packing4–7 days
Some stages run in parallel, so the total is often shorter than the sum.
Quality, tests and certificates
Tests and inspections
- Dimensional stability (shrinkage) AATCC 135 / ISO 6330
- Colour fastness to washing ISO 105-C06 and rubbing ISO 105-X12
- Spirality / torque after wash
- Pilling ISO 12945
- Fabric weight (GSM) and composition
- Seam strength
- AQL 2.5 final inspection (third-party on request: SGS, Intertek, Bureau Veritas)
- Wicking and drying rate
- Squat-proof opacity
Certificates available
Ask for the certificate copies of the factory or farm that makes your order.
Ready to price your activewear & sportswear order?
Add types to your quote, then send one request for everything.








